This freakin' bathroom is killing me!!! Actually it's the sanding of the joints that is killing me! I thought I had the ceiling all done until it was primed. There's one joint that just looks like crap so I will have to go back and fix it. I will breathe easier once this is done.
My list again:
- Finish sanding joints (almost done)
- Ceiling joints (one more joint left)
- Wall joint at tub/shower needs feathering
- Finish sink and mirror supports behind wall (DONE!)
- Paint ceiling (primed but will need touch up)
- Paint walls (half primed)
- Strip and replace door and window trim
- Tile walls
- Get knee wall top piece
- Tile floor
- Get threshold piece
- Install toilet
- Install sink
RYOBI ONE+ 6pc Combo Kit and 60pc Bit Set Review
4 years ago
No comments:
Post a Comment